Family built. Field proven. Since 1994.Talk to our team: 765-617-4994
Illustrative model of Grain stirring down augerIllustrative model
Illustrative model of this equipment or component type. Exact appearance, dimensions and included accessories are confirmed in your quote.

Parts & components

Stir-ator Down Auger Flighting - 4 ft Length

Catalog reference: STIR-ATOR-DOWN-AUGER-FLIGHTING-4FT

Manufacturer: Perry Equipment. Model and accessory compatibility are reviewed with your quote.

Current pricingBuilt around your scope.

Request an itemized quote for this equipment, options, freight and installation. Your request is reviewed by Knopp Construction before you order.

Ask about this itemTalk to Knopp · 765-617-4994

Know what you’re comparing

Catalog specifications.

Reference
STIR-ATOR-DOWN-AUGER-FLIGHTING-4FT
Section
Auger Repair Flighting
Type
Stir-ator Down Auger Flighting
Catalog Section
Auger Repair Flighting
Catalog Table
Stir-ator Down Auger Flighting
Catalog Unit
4 ft length
Outside diameter (OD)
2"
Inside diameter (ID)
1"
Flight thickness
1/4"
Available length
4 ft

Source: imported owner catalog, reviewed for website formatting October 7, 2026; manufacturer verification pending. These values identify an existing catalog reference. We confirm the manufacturer, exact model, capacity, included accessories and availability for your application.

Down-auger flighting fit boundary: the outside diameter, inside diameter, thickness and available length reproduce the imported row. They do not approve interchangeability. Knopp must verify the exact Stir-ator model, rotation, shaft, clearances and application.

A complete answer

What goes into your quote.

What else will I need?

Ask the team to confirm compatible unloads, fans, controls, structures, utility connections and installation requirements for the exact selected model. Related references below are alternatives to explore, not an assurance of compatibility.

  1. Equipment & options

    Exact configuration, accessories and compatibility.

  2. Getting it to your site

    Freight, access and unloading requirements.

  3. Putting it to work

    Installation, concrete and electrical responsibilities, where applicable.

Start the conversation

Manufacturer resources and service